

Helena Middle School
Shelby County Board of Education
Building Program: Grades 6-8 (500 Students)
166,400 sq. ft.
Design Features/Services Provided:
- Centralized administrative area (cabinets and shelving included)
- Academic classrooms (student lockers included)
- Two science labs
- Business lab
- Media center and support facilities
- Computer lab
- Band room and support rooms
- Art room and support facilities (storage cabinets and shelving included)
- Health classroom
- Family and consumer science
- Shop and industrial arts department
- Multi-use kitchen/cafetorium with stage
- Gymnasium and support facilities with podium
- Student and teacher toilets
- Handicapped toilet and shower facilities
- Maintenance equipment area
- Grand Master hardware with removable core system
- Building security system
- Building sound system with integral LED clock system
- Fire alarm system – fully sprinklered building
- HVAC – DDC control system
- Brick exterior on all elevations
- Standing-seam roof
- Full mezzanine-level storage and equipment access
- Site landscaping and sprinkler system
- Grading for future fields