Hayden High School

Blount County Board of Education
Building Program: Grades 9-12 (850 Students)
111,400 sq. ft.

Design Features/Services Provided:

  • Centralized administrative area (cabinets and shelving included)
  • Academic classrooms (student lockers included)
  • Four science labs
  • Media center and support facilities
  • Computer lab (furniture included)
  • Band room and support rooms
  • Music room and support rooms
  • Art room and support facilities (storage cabinets and shelving included)
  • Auditorium/stage
  • Family and consumer science
  • Shop department
  • Multi-use kitchen/cafetorium with podium
  • Gymnasium and support facilities
  • Student and teacher toilets (masonry partitions)
  • Handicapped toilet and shower facilities
  • Maintenance equipment area
  • Grand Master hardware with removable core system
  • Building security system
  • Building sound system with integral LED clock system
  • Fire alarm system – fully sprinklered building
  • HVAC – DDC control system
  • Brick exterior on all elevations
  • Composition shingle roof
  • Site landscaping and sprinkler system